Polymelt worldwide. Some references.
Every year, about 10,000 kilometres of Polymelt pipes are installed all over the world - up to 140 kilometres (140,000 m) in just one project. The building objects, in which our pipes and fittings are used worldwide, are both various and impressive. Here you find some of our references

Al Habtoor City Hotel,
Dubai.
Product: 40,000 m ECOSAN ML5 and ECOSAN fittings
Construction period: 2012–2018

Ajman Corniche Residences,
Dubai.
Product: 63,500 m ECOSAN ML5 and ECOSAN fittings
Floors: 4 buildings with up to 47 floors, finished in 2018

Discovery Primea Hotel,
Makati City.
Product: 99.000 meter of POLYMUTAN pipe and fittings.
Floors: 68, construction period: 2013 - 2014

Sheikh Jaber Al Ahmad Cultural Centre, Kuwait.
Product: 60,000 m ECOSAN and ECOSAN fittings.
Building: 4 buildings on a surface of 214,000 m²
Construction period: completed in 2016

MEA Training Center Beirut,
Lebanon.
Product: 40,000 m POLYMUTAN ML5 and POLYMUTAN fittings.
Buildings: 8
Construction period: 2017

Century Trump Tower,
Makati City, Philippines.
Product: 143,000 m POLYMUTAN and POLYMUTAN fittings
Floors: 57
Construction period: 2012–2017

Anchor Land Mandarin,
Manila, Philippines.
Product: 40,000 m ECOSAN and ECOSAN fittings
Floors: 39
Construction period: 2007–2009

United Tower Manama,
Bahrain.
Product: approx. 40,000 m POLYMUTAN and POLYMUTAN fittings
Floors: 14
Construction period: 2011–2016
