Al-Andalus Complex, Hawally/Muhallab
Product: ECOSAN ML5 and ECOSAN fittings
Floors: 3 basements+ 19 floors, 10.000 m²
Al Khiran, Sabah Al – Ahmad City
Product: ECOSAN pipe & ECOSAN fittings
350.000 m² project area, 70.000 m² retail area with 70.000 m² car park area
Ajman Corniche Residences,
Dubai.
Product: 63,500 m ECOSAN ML5 and ECOSAN fittings
Floors: 4 buildings with up to 47 floors, finished in 2018
Al Habtoor City Hotel,
Dubai.
Product: 40,000 m ECOSAN ML5 and ECOSAN fittings
Construction period: 2012–2018
Anchor Land Mandarin,
Manila, Philippines.
Product: 40,000 m ECOSAN and ECOSAN fittings
Floors: 39
Construction period: 2007–2009
Sheikh Jaber Al Ahmad Cultural Centre, Kuwait.
Product: 60,000 m ECOSAN and ECOSAN fittings.
Building: 4 buildings/214,000 m²
Construction period: completed 2016
MEA Training Center Beirut,
Lebanon.
Product: 40,000 m POLYMUTAN ML5 and POLYMUTAN fittings.
Buildings: 8
Construction period: 2017
Discovery Primea Hotel,
Makati City.
Product: 99.000 meter of POLYMUTAN pipe and fittings.
Floors: 68, construction period: 2013 – 2014
Century Trump Tower,
Makati City, Philippines.
Product: 143,000 m POLYMUTAN and POLYMUTAN fittings
Floors: 57
Construction period: 2012–2017
United Tower Manama,
Bahrain.
Product: approx. 40,000 m POLYMUTAN and POLYMUTAN fittings
Floors: 14
Construction period: 2011–2016
Ras Al-Ard Club
Product: ECOSAN pipe & ECOSAN fittings
35.000 m², 2 floors
Need more information?
Please contact us.